6 results
Pump P-204B Maintenance Report — Q3
PDFVibration spike detected on 2026-07-02 at P-204B. Bearing replaced per SOP-771 by J. Martinez. Failure code F-2213 cleared after 6-hour test run.
Date: 2026-07-02Asset: P-204BSOP: SOP-771Personnel: J. MartinezFailure Code: F-2213
P&ID — Unit 300 Cooling Loop rev.C
P&IDHeat exchanger HX-311 upstream of V-312. Interlock I-88 trips at 92°C. Reference drawing DWG-4402.
Equipment: HX-311Equipment: V-312Failure Code: I-88
Incident Email — Compressor C-118 Trip
EmailC-118 tripped 2026-07-17 03:14. Operator R. Chen isolated per SOP-204. Root cause pending inspection INS-9910.
Asset: C-118Date: 2026-07-17Personnel: R. ChenSOP: SOP-204
Turbine T-04 Inspection Photos
ImageOCR extracting nameplate data and inspector tags.
Q2 Compliance Audit — Section 4.2
DOCX12 non-conformances closed. 3 open under CAPA-556 owned by M. Hodge, due 2026-08-15.
Failure Code: CAPA-556Personnel: M. HodgeDate: 2026-08-15
Vibration Trend Data — Q2 Turbines
XLSX6-month rolling vibration baseline. T-04 trending +12% vs Q1.
Asset: T-04